No | Nama Peserta | K | A | T | ST | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. ANUGRAH KARYA MANDIRI - 02.119.003.8-722.000 | |
|
||||||||
2 | exindo consultant - 03.026.787.6-805.000 | 51,44 | Rp. 90.557.500,00 |
Rp. 0,00 di bawah 80% Nilai HPS |
Nilai tidak mencapai passinggrade | ||||||
3 | CV. Teknik Cipta Parisudha - 02.678.729.1-811.000 | Rp. 90.000.000,00 |
Rp. 0,00 di bawah 80% Nilai HPS |
Surat penawaran tidak sesuai yang dipersyaratkan dokumen pengadaan | |||||||
4 | CV. DRAFTECH ENGINEER - 71.963.816.5-822.000 | |
|
||||||||
5 | PT. PARADHIGUNA DWIPANTARA LOKA - 72.003.128.5-822.000 | |
|
||||||||
6 | CV.ACCESS CONSULTANT - 03.269.414.3-816.000 | |
|
||||||||
7 | CV. MEGAH REZKY ARCHITECTURE - 74.382.899.8-811.000 | |
|
||||||||
8 | Mulya Selaras Konsultan - 01.652.745.9-811.000 | |
|
||||||||
9 | CV. GRID DESIGN CONSULTANT - 72.238.928.5-816.000 | |
|
||||||||
10 | PT.Rancang Rencana Indonesia - 76.152.135.0-801.000 | |
|
||||||||
11 | Maranggo Design Engineer Consultant, Cv - 02.678.964.4-811.000 | |
|
||||||||
12 | CV. MULTI KARYA PRATAMA - 03.026.672.0-805.000 | |
|
||||||||
13 | CV. SEJAHTERA BERSAMA - 01.987.526.9-811.000 | |
|
||||||||
14 | CV. MAKMUR JAYA INDONESIA - 03.107.138.4-811.000 | |
|
||||||||
15 | CV. AFHAQI CORPORATION - 02.866.556.0-815.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak